Criticism Hydro-Québec's electricity transmission system



the performance of hydro-québec transÉnergie s power grid during 1998 ice storm raised questions fundamental concept, vulnerability, , reliability of grid. critics noted power generation facilities located approximately 1,000 km (600 mi) away population centres , there lack of local power stations around montreal, served 6 735 kv feeder lines. in addition, 735 kv transmission system received scorn public , media. power transmission grid said concentrate power transmission on few 735 kv lines, such run james bay montreal. out of 6 735 feeder lines in montreal, 5 of them form loop called ring of power around city. when ring failed on january 7, 1998, 60% of greater montreal s power supply offline. hydro-québec s large above-ground transmission , distribution system considered exposed natural disasters, although cost of undergrounding grid prohibitive.


the technology utilized on hydro-québec transÉnergie grid came under fire critics. claimed technology, used improve performance, safety, , reliability, made people in quebec over-dependent on power grid energy needs, since electricity, hydroelectric power, makes on 40% of quebec s energy supply. dependence, evidenced fact ontario farmers had more backup generators farmers in quebec, can increase severity of consequences when grid fails, did in january 1998.








Comments

Popular posts from this blog

Independence United Arab Emirates

History Alexandra College

Management School of Computer Science, University of Manchester